Integrative Process, Planning, and Assessments / 整合过程、规划与评估

Current Facilities Requirements and O+M Plan

现有设施要求与O+M计划
IPp4 Prerequisite
EN

Integrative Process, Planning, and Assessments Prerequisite CURRENT FACILITIES REQUIREMENTS AND O+M PLAN IPp4 REQUIRED

CN

现有设施要求与O+M计划 IPp4 必要项

INTENT / 意图

EN

To promote continuity of information to ensure that energy-efficient operating strategies are maintained and to provide a foundation for green jobs training and system analysis.

CN

促进信息连续性,确保节能运营策略得以维持,并为绿色就业培训和系统分析提供基础。

REQUIREMENTS / 要求

EN

Current Facilities Requirements and O+M Plan Maintain a current facilities requirements (CFR) and operations and maintenance (O+M) plan that contains the information necessary to operate the project efficiently. The plan must include the following:

CN

当前设施要求与O+M计划 维护一份当前设施要求(CFR)和运营与维护(O+M)计划,其中包含高效运营项目所需的信息。该计划必须包括以下内容:

EN

• Current sequence of operations for the building

CN

• 建筑的当前运营序列

EN

• Project occupancy schedule

CN

• 项目使用时间表

EN

• Equipment run-time schedules

CN

• 设备运行时间表

EN

• Set points for all HVAC equipment

CN

• 所有HVAC设备的设定值

EN

• Set points for lighting levels throughout the project

CN

• 项目各处照明水平的设定值

EN

• Information on ventilation system operation and preventativepreventive maintenance as

CN

• 通风系统运行和预防性维护信息,依据

EN

outlined in ASHRAE 62.1-2022,1 Table 8.1

CN

ASHRAE 62.1-2022表8.1中的规定

EN

• Changes in schedules or set points for different seasons, days of the week, and times of

CN

• 不同季节、星期和时间的日程或设定值变化

EN

day

CN

day

EN

• Systems narrative for mechanical and electrical systems and equipment in the project

CN

• 项目中机械和电气系统及设备的系统说明

EN

• Preventive maintenance plan for mechanical, electrical, and envelope systems and

CN

• 机械、电气和围护结构系统及设备的预防性维护计划

EN

equipment in the project The CFR and O+M plan must be current at the time of the LEED application. 1 “Ventilation and Acceptable Indoor Air Quality,” ASHRAE 62.1-2022.

CN

CFR和O+M计划在提交LEED申请时必须是最新的。1 “通风与可接受的室内空气质量”,ASHRAE 62.1-2022。