— MINIMUM ENERGY PERFORMANCE EAp3 Required
最低能源绩效 EAp3 必须满足
To promote resilience and reduce the environmental and economic harms of excessive energy use and greenhouse gas emissions by achieving a minimum level of energy efficiency.
通过达到最低水平的能源效率,提升韧性,并减少过度能源使用与温室气体排放造成的环境与经济危害。
Achievement Pathways Points Existing Buildings N/A
选项 1. ENERGY STAR 得分 或 选项 2. 能源使用强度目标 或 选项 3. 相对历史基线的绩效
Option 1. ENERGY STAR Score
建筑能源效率
OR
• 在美国和加拿大有资格获得 ENERGY STAR 得分的物业类型必须遵守选项 1。
Option 2. Energy Use Intensity Targets
• 在美国和加拿大以外有资格获得 ENERGY STAR 得分的物业类型必须遵守选项 1 或选项 2。
OR
• 附录 II 表 1 中提及、无资格获得 ENERGY STAR 得分的物业类型必须遵守选项 2 或选项 3。
Option 3. Performance Relative to Historical Baseline Building energy efficiency
• 所有其他物业类型必须遵守选项 3 或查阅附加指引/要求。
Option 1.
选项 1. ENERGY STAR 得分 在 12 个月报告期内,使用美国环境保护署(EPA)ENERGY STAR Portfolio Manager 工具达到至少 60 分的 ENERGY STAR 得分。要将选项 1 应用于美国和加拿大以外的项目,请参考 ASHRAE 标准 169-2021《建筑设计的气候数据》,并选择同一气候区且气候特征相似的 ENERGY STAR Portfolio Manager 地点。
Option 2.
Option 3.
Option 1. ENERGY STAR Score During the 12-month reporting period, achieve an ENERGY STAR score of at least 60 using the U.S. Environmental Protection Agency (EPA) ENERGY STAR Portfolio Manager tool.3 To apply Option 1 to projects outside of the U.S. and Canada, consult ASHRAE Standard 169-2021, “Climatic Data for Building Design Standards,”4 and select an ENERGY STAR Portfolio Manager location in the same climate zone and with similar climate characteristics. 3 Energy Star, “Portfolio Manager,” n.d., https://portfoliomanager.energystar.gov/pm/login?testEnv=false. 4 ASHRAE,“Climatic Data for Building Design Standards,” ASHRAE 169-2021,” 2021, https://store.accuristech.com/ashrae/standards/ashrae-169-2021?product_id=2238548.
OR
Option 2. Energy Use Intensity Targets For the 12-month reporting period, meet the site energy use intensity (EUI) or source EUI targets established for the project’s building type(s) and climate zone in Appendix II based on ASHRAE 100-2024.
OR
Option 3. Performance Relative to Historical Baseline For property types not eligible to receive an ENERGY STAR score, compare the building’s total annual site and source energy consumption for the 12-month reporting period with historical baseline site and source energy consumption data from a 12-month reporting period with similar occupancy occurring within eight years before the end of the 12-month reporting period. Demonstrate at least an 8% reduction in either site energy use or source energy use beyond the historical baseline. Historical data may be normalized against the reporting period for weather or operational variables, such as occupancy or production throughput. High-process-load buildings that meet the following criteria demonstrate a 4% reduction in energy use for performance relative to the historical baseline.
• Property types eligible to receive an ENERGY STAR score in the U.S. and Canada must comply with
• Property types eligible to receive an ENERGY STAR score outside of the U.S. and Canada must comply with either Option 1 or
• Property types referenced in Appendix II, Table 1, that are ineligible to receive an ENERGY STAR score must comply with either Option 2 or
• All other property types must comply with Option 3 or review additional guidance/requirements.
• Building activity classification not referenced in Appendix II, Table 1, Building Category Classifications, or a project narrative demonstrates that the building function is directly linked to heightened energy usage compared to other buildings with the same building activity classification
• Energy use associated with manufacturing or industrial equipment, including equipment used for conveyance of people or objects, uncontrollable loads, life safety requirements, and/or security requirements, contributes at least 50% of the total energy consumption, meaning that at least 50% of the total building energy consumption cannot be modified using standard efficiency/retrofit measures, including o Envelope improvements; o Internal load reductions to lighting, ENERGY STAR-eligible equipment, etcand so forth;. o HVAC or domestic hot water (DHW) efficiency upgrades; and o Controls upgrades to HVAC, DHW, or lighting systems.