— ENERGY AND ATMOSPHERE and Restoration Energy and Atmosphere Prerequisite CARBON PROJECTION FROM ENERGY USE EAp1 REQUIRED
能源使用碳排放预测 EAp1 必要项
To provide a baseline operational carbon emissions projection from energy use and to increase carbon literacy at the project level and throughout the real estate industry.
为能源使用建立基准运营碳排放预测,并在项目层面乃至整个房地产行业内提升碳素养。
Operational Carbon Projection Building Performance Standard Business-as-Usual Projection Using the annual energy use data submitted, the project’s current grid data, and the project’s location, USGBC will generate a 25-year “business-as-usual” (BAU) projection of the project’s carbon emissions, including a comparison with a straight-line reduction. Provide a high-level estimated end-use breakdown as shown in Table 1.
Operational Carbon Projection Building Performance Standard Business-as-Usual Projection Using the annual energy use data submitted, the project’s current grid data, and the project’s location, USGBC will generate a 25-year “business-as-usual” (BAU) projection of the project’s carbon emissions, including a comparison with a straight-line reduction. Provide a high-level estimated end-use breakdown as shown in Table 1.
Table 1. Estimated End-Use Breakdown End Use Electrical Fuel Used Total Total Site Used (Y/N) (Y/N) and Electrical Fuel Use Energy Type Use (%) (%) Use (%) Space heating Water heating Cooking Space cooling Lighting Plug, process, and other Building Performance Standard Business-as-Usual Projection Projects subject to a carbon-based or energy use intensity (EUI)-based building performance standard (BPS) must create an ordinance-specific 25-year BPS-BAU projection with an overlay of the BPS caps. For EUI-based BPS, the BPS-BAU must be an energy BAU, and for carbon- based BPS, the BPS-BAU must be a carbon BAU that reflectsing the electrical carbon coefficients as defined in the ordinance. If applicable, calculate the assessed annual fines or fees that will apply for exceeding the caps and the cumulative fines or fees over the 25-year period. The owner or owner's representative must attest that they have reviewed the project’s BAU and fee projections.
Table 1. Estimated End-Use Breakdown End Use Electrical Fuel Used Total Total Site Used (Y/N) (Y/N) and Electrical Fuel Use Energy Type Use (%) (%) Use (%) Space heating Water heating Cooking Space cooling Lighting Plug, process, and other Building Performance Standard Business-as-Usual Projection Projects subject to a carbon-based or energy use intensity (EUI)-based building performance standard (BPS) must create an ordinance-specific 25-year BPS-BAU projection with an overlay of the BPS caps. For EUI-based BPS, the BPS-BAU must be an energy BAU, and for carbon- based BPS, the BPS-BAU must be a carbon BAU that reflectsing the electrical carbon coefficients as defined in the ordinance. If applicable, calculate the assessed annual fines or fees that will apply for exceeding the caps and the cumulative fines or fees over the 25-year period. The owner or owner's representative must attest that they have reviewed the project’s BAU and fee projections.