— PEAK LOAD REDUCTION PERFORMANCE EAc4 1 point
峰值负荷削减绩效 EAc4 1 分
To reduce the stress on the grid from peak loads, reduce greenhouse gas emissions, increase grid reliability, and make energy generation and distribution systems more affordable and more efficient.
降低峰值负荷对电网的压力,减少温室气体排放,提高电网可靠性,并使能源生产与输配系统更经济、更高效。
Achievement Pathways Points Existing Buildings 1
达标路径:选项 1. 电力需求削减(1 分)或 选项 2. 热力需求削减(1 分)。
Option 1. Electric Demand Reduction 1
选项 1. 电力需求削减(1 分) 项目必须配备至少按小时计量建筑用电需求的电力间隔计量表;具备月度峰值用电需求上报能力的公用事业计量表亦可接受。对于设有多块电表的建筑,建筑月度峰值需求可采用月度同时峰值需求,或各电表月度峰值需求之和来确定。租户电表或不具备小时间隔计量能力的电表,可在不超过建筑总面积 20% 的范围内予以剔除。
OR
报告当前 12 个月报告期以及基准 12 个月报告期(该基准期须落在 12 个月报告期结束前八年之内)的建筑月度峰值用电需求。将当前报告期与基准报告期比较,证明需求最高的两个月峰值需求之和下降 10%。数据可针对设备电气化进行归一化处理。
Option 2. Thermal Demand Reduction 1
或 选项 2. 热力需求削减(1 分) 项目必须配备热计量表或测量装置,能够对不少于项目已安装热力总容量 80% 的部分测量并记录以下内容:
Option 1. Electric Demand Reduction (1 point) The project must have electric interval meters that measure building electric demand at least hourly. Utility meters with monthly peak electric demand reporting capabilities are acceptable. For a building with multiple electric meters, building peak monthly demand may be determined using either monthly peak coincident demand or the sum of peak monthly demand from each meter. Tenant meters or meters without hourly interval metering capabilities may be excluded for up to 20% of the gross building area. Report the monthly peak building electric demand for the current 12-month reporting period and for a baseline 12-month reporting period occurring within eight years before the end of the 12-month reporting period. Compare the current reporting period to the baseline reporting period to demonstrate a 10% reduction in the sum of monthly peak demand for the two months with highest demand. Data may be normalized for equipment electrification.
• 供热需求(适用于气候区 3–8):测量用于空间供暖、生活热水与工艺加热的每小时热能消耗总量;
OR
• 供冷需求(适用于气候区 0–5):测量用于空间供冷与工艺冷却的每小时热能消耗总量。
Option 2. Thermal Demand Reduction (1 point) The project must have thermal meters or measurement devices capable of measuring and recording the following for at least 80% of the project’s total installed thermal capacity:
报告当前 12 个月报告期以及基准 12 个月报告期(须落在 12 个月报告期结束前八年之内)的月度小时峰值供热需求与月度小时峰值供冷需求。将当前报告期与基准报告期比较,证明最大月度供热需求与最大月度供冷需求之和下降 10%。
• Heating demand (for climate zones 3–8): measure total hourly thermal energy consumed for space heating, service water heating, and process heating.
• Cooling demand (for climate zones 0–5): measure total hourly thermal energy consumed for space cooling and process cooling. Report the monthly peak hourly heating demand and the monthly peak hourly cooling demand for the current 12-month reporting period and for a baseline 12-month reporting period occurring within eight years before the end of the 12-month reporting period. Compare the current reporting period to the baseline reporting period to demonstrate a 10% reduction in the sum of the maximum monthly heating demand and the maximum monthly cooling demand.