— WATER METERING AND LEAK DETECTION WEc1 1 point
Decarbonization · 脱碳 WEc1 1 分
To conserve potable water, support water management, limit material waste caused by leak damage, and uncover further savings by tracking consumption at the subsystem level.通过子系统级用水追踪来保护饮用水、支持用水管理、减少漏损造成的材料浪费,并发现更多节水机会。
Choose one of two paths for 1 point. Option 1 Submeters: install permanent meters for each applicable subsystem (indoor plumbing fixtures/fittings covering >=80%, irrigation, each makeup water system, commercial kitchen if >=100 meals/day, laundry if >=120,000 lb/yr), with real-time data access and hourly recording. Option 2 Leak Detection Sensors: install permanent flow meters/sensors on irrigation entry, >=50% of flush fixtures, and each makeup water system, triggering alarms on abnormal flow or detected leaks, plus a documented action plan. Healthcare and residential projects have tailored requirements.二选一得 1 分。路径一子表计量:为各适用子系统安装永久水表(室内器具配件覆盖≥80%、灌溉、各补给水系统、日供餐≥100 份的商业厨房、年洗衣≥120,000 磅的洗衣房),数据可实时访问且至少每小时记录。路径二漏损检测传感器:在灌溉入口、≥50% 冲水器具及各补给水系统安装永久流量表/传感器,异常流量或检测到漏水时报警,并制定行动计划。医疗与住宅项目有专门要求。
Option 1 requires submetering of major subsystems; real-time access via BMS/cloud/app and hourly recording are mandatory.Option 2 needs leak detection on irrigation entry, at least 50% of flush fixtures, and every makeup water system, with alarms and an action plan.Healthcare projects must submeter five additional specialized subsystems (e.g., RO water, dietary, lab, surgical suite) or all applicable ones.Residential projects meter each dwelling unit's total potable use; Core & Shell must provide future tenant metering (min. one meter per floor).Early design-phase planning of submeters optimizes placement, piping, and cost while revealing the largest water consumers. 路径一要求对主要子系统子表计量;强制要求通过 BMS/云/App 实时访问且至少每小时记录。路径二须在灌溉入口、至少 50% 冲水器具、各补给水系统安装漏损检测,并具备报警与行动计划。医疗项目须对五个额外专门子系统(如反渗透水、配餐、实验室、手术间)或所有适用系统子表计量。住宅项目逐户计量总饮用水用量;Core & Shell 须为未来租户预留计量(每层至少一块表)。在设计早期规划子表可优化布置、管线和成本,并揭示最大用水环节。