— WASTE REDUCTION PERFORMANCE MRc1 1–12 points
废弃物减量绩效 MRc1 1–12 分
To prevent waste and reduce the amount of materials from building operations and maintenance disposed of in landfills or incinerators.
防止废弃物产生,并减少建筑运营与维护产生的材料被送往填埋场或焚烧炉的数量。
Achievement Pathways Points Existing Buildings 1–12 Waste Diversion 1–12 Divert materials generated from building operations and maintenance activities from reaching landfills, incineration (waste-to-energy), or other disposal methods. Diversion includes strategies such as waste prevention (reduction), reuse, recycling, or composting. Points are awarded according to
将建筑运营与维护活动产生的材料从填埋、焚烧(废物发电)或其他处置方式中分流。分流策略包括废弃物预防(减量)、再利用、回收或堆肥。得分依据表 1。
Table 1.
表 1. 废弃物分流 LEED 得分
Table 1. LEED Points for Waste Diversion Waste Diversion Points 6% 1 12% 2 18% 3 24% 4 30% 5 36% 6 42% 7 48% 8 54% 9 60% 10 70% 11 80% 12 Waste Diversion Calculation Calculate a waste diversion rate by tracking the total amount of materials generated from ongoing building operations and maintenance activities for a minimum of three consecutive months within the 12-month reporting period. Track waste generation monthly and include the material type and weight of all nonhazardous solid materials. Track or estimate variations in materials management that occur outside the reporting period, such as seasonal collection or intermittent waste streams. Calculate waste diversion by tracking the amount of materials (by weight) diverted from landfills and incineration. For diverted materials, specify the diversion method (reduce, reuse, recycle, compost, etc.). If material quantities are estimated, provide the methodology and/or source references used to make calculations. If actual weights are unavailable for certain material types or hauling methods, volume-to-weight conversion average values can be used. To calculate the overall diversion rate, divide the weight of materials diverted by the total weight of materials generated for the same reporting period. Account for seasonal collection or intermittent waste streams within the calculations. See Equation 1 for the waste diversion calculation:
废弃物分流率 | 得分
Equation 1. Waste diversion calculation %) = 100 × � : ℎ � + � : ℎ � + � : ℎ � + � : ℎ � ℎ
6% | 1
12% | 2
18% | 3
24% | 4
30% | 5
36% | 6
42% | 7
48% | 8
54% | 9
60% | 10
70% | 11
80% | 12
废弃物分流计算 通过追踪持续建筑运营与维护活动产生材料的总量(至少连续三个报告期)来计算废弃物分流率。