计算 · 学习 · 标准
Energy and Atmosphere / 能源与大气

Grid Interactive

电网互动
EAc5 Credit
EN

— GRID INTERACTIVE EAc5 1–3 points

CN

电网互动 EAc5 1–3 分

Intent / 意图

EN

To enhance power resilience and position buildings as active partners contributing to grid decarbonization, reliability, and power affordability through peak thermal load reduction and integrated management of building loads in response to variable grid conditions.

CN

通过降低峰值热负荷与综合管理建筑负荷以响应电网变化,增强电力韧性,使建筑成为电网脱碳、可靠性与电价可承受性的积极伙伴。

Requirements / 要求

EN

Achievement Pathways Points Commercial Interiors 1–3

CN

达标路径:1–3 分

EN

Option 1. Peak Thermal Load Reduction 1–3

CN

下列要求可在建筑层面或仅就项目范围进行记录,任意组合最高 3 分。

EN

Path 1. Ventilation Energy or Heat Recovery 1 AND/OR

CN

选项 1. 峰值热负荷削减(1–3 分) 每满足以下路径之一得 1 分。

EN

Path 2. Low Thermal Conductance 1 AND/OR

CN

路径 1. 通风能量或热回收(1 分) 每个向项目供应室外空气的送风系统须配备能量或热回收装置,最低全热回收效率 70% 或最低显热回收效率 75%;须设旁通或控制,以便在室外空气条件适宜时绕过能量回收装置;合计室外空气量小于项目总量 15% 的送风系统可排除。

EN

Path 3. Infiltration 1

CN

和/或 路径 2. 低热导率(1 分) 首次装修项目须按 ASHRAE 90.1-2022 第 5.5.5 节满足热桥规定;气候区 0–3 不得适用例外。位于既有建筑的项目须证明围护结构总 UA(U 值乘以构件面积之和)不超过典型建筑围护结构总 UA 的 125%,或采用符合 90.1-2022 第 5.5.5 节的热桥缓解措施。

EN

AND/OR

CN

和/或 路径 3. 渗透控制(1 分) 对项目所在建筑外围护结构进行空气密封,使气密性达到规定限值,或按 90.1-2022 进行鼓风门测试并满足特定空气泄漏率。

EN

Option 2. Energy Storage 1–2

CN

和/或 选项 2. 储能(1–2 分) 安装现场储能系统(电池、冰蓄冷、相变材料等),容量至少能转移项目峰值电力需求的 10%(1 分)或 20%(2 分);储能系统须能参与电网互动或削峰。

EN

AND/OR

CN

和/或 选项 3. 需求响应计划(1 分) 项目参与经批准的电网需求响应计划,或安装能响应价格/事件信号的自动负荷削减系统,且覆盖项目峰值负荷的至少 20%。

EN

Option 3. Demand Response Program 1

CN

和/或 选项 4. 自动需求侧管理(1 分)

EN

AND/OR

CN

路径 1. 系统级控制(1 分) 安装独立的系统级负荷管理控制,能根据电网信号自动调整 HVAC、照明、热水等负荷。

EN

Option 4. Automated Demand-Side Management 1

CN

或 路径 2. 楼宇自动化系统(1 分) 将项目系统接入建筑 BAS/DDC,实现基于实时电网信号的自动需求侧管理。

EN

Path 1. System-Level Controls 1 OR

CN

和/或 选项 5. 电力韧性(1 分) 为关键负荷提供至少 4 小时的备用电源(UPS、蓄电池、燃料电池等),确保电网中断期间关键系统继续运行;或安装微电网系统,能在孤岛模式下运行。

EN

Path 2. Building Automation System 1

CN

 

EN

AND/OR

CN

 

EN

Option 5. Power Resilience 1 Comply with any of the following up to a maximum of 3 points. Each requirement may be documented at the building level or for the project only.

CN

 

EN

Option 1. Peak Thermal Load Reduction (1– 3 points) Comply with any of the following peak thermal load reduction criteria for 1 point each. PATH 1. VENTILATION ENERGY OR HEAT RECOVERY (1 POINT) Each fan system supplying outdoor air to the project shall have an energy or heat recovery system with a minimum 70% enthalpy recovery ratio or a minimum 75% sensible heat recovery ratio. Provisions must be made to bypass or control the energy recovery system during moderate outside air conditions. In aggregate, fan systems supplying less than 15% of the project’s total outdoor air can be excluded. AND/OR PATH 2. LOW THERMAL CONDUCTANCE (1 POINT) For initial build-out, comply prescriptively with the thermal bridging requirements of ASHRAE 90.1-2022, Section 5.5.5. Projects in climate zones 0–3 shall not be excepted. For projects locating in an existing building, demonstrate one of the following:

CN

 

EN

Table 1. Caps on Air Leakage Rates Pressure Test Conditions Across the Building Envelope Maximum Air Leakage* Initial Build-Out Renovation of Previously Occupied Space At pressure difference of 50 Pascals (0.2 in H2O) 0.17 cfm/sq. ft. (0.85 L/s × sq. m.) 0.26 cfm/sq. ft. (1.3 L/s × sq. m.) At pressure difference of 75 Pascals (0.3 in H2O) 0.24 cfm/sq. ft. (1.20 L/s × sq. m.) 0.35 cfm/sq. ft. (1.75 L/s × sq. m.) *Air leakage per square foot or square meter of building envelope area (including exterior walls, roofs, and base floor/slab). PATH 3 NOTE: Complete air leakage testing using ASTM E779, ANSI/RESNET/ICC 380, ASTM E3158, ASTM E1827, or equivalent.

CN

 

EN

AND/OR

CN

 

EN

Option 2. Energy Storage (1–2 points) Provide on-site electric storage and/or thermal storage meeting the criteria in

CN

 

EN

Table 2. Include automatic load management controls capable of storing the electric or thermal energy during off-peak periods or periods with low grid carbon intensity, as well as using stored energy during on-peak periods or periods of high grid carbon intensity.

CN

 

EN

Table 2. Peak Storage Capacity Relative to Peak Demand Storage 1 Point 2 Points Electric storage capacity Relative to peak electric demand 0.2 kWh/kW 0.4 kWh/kW Thermal storage capacity Relative to peak coincident thermal demand (heating + cooling + SWH + process heat) 1.0 kWh/kW or Btu/Btu/hr or ton-hr/ton 2.0 kWh/kW or Btu/Btu/hr or ton-hr/ton

CN

 

EN

AND/OR

CN

 

EN

Option 3. Demand Response Program (1 point) Enroll in a minimum one-year demand response (DR) contract with a qualified DR program provider, with the intention of multiyear renewal. On-site combustion-based electricity cannot be used to meet the demand-side management criteria.

CN

 

EN

AND/OR

CN

 

EN

Option 4. Automated Demand-Side Management (1 point) On-site combustion-based electricity cannot be used to meet the demand-side management criteria. PATH 1. SYSTEM-LEVEL CONTROLS (1 POINT) Provide automated demand response controls for at least two of the following systems installed within the project scope of work:

CN

 

EN

AND/OR

CN

 

EN

Option 5. Power Resilience (1 point) Identify critical equipment that requires continuous operation. Design the project to be capable of islanding and operating independently from the grid to power the critical loads with the project’s on-site renewable and energy storage systems for a minimum of three days.

CN

 

EN

• Total envelope UA (the sum of U-factor times assembly area) no more than 125% of the total building envelope UA that meetsing the ASHRAE 90.1-2022 prescriptive building envelope criteria for new construction.

CN

 

EN

• Minimum 30% improvement in total envelope UA for the alteration versus historical total envelope UA (no more than three years prior to project registration), AND total envelope UA is no more than 200% of the conductance of a total building envelope UA that meetsing the ASHRAE 90.1-2022 prescriptive envelope criteria for new construction. AND/OR PATH 3. INFILTRATION (1 POINT) Either at the building level, or for the compartmentalized tenant space, demonstrate one of the following through air leakage testing conducted within five years of project occupancy:

CN

 

EN

• Measured air leakage of the building envelope less than or equal to Table 1, OR

CN

 

EN

• For projects locating in existing buildings, a reduction in air leakage of at least 30%, to a measured air leakage less than 1.0 cfm/sq. ft. (5 L/s × sq. m.) at 75 Pascals (0.3 in H2O) documented through air leakage testing before and after alterations are implemented.

CN

 

EN

• HVAC systems (50% of rated capacity)

CN

 

EN

• Lighting systems (50% of power)

CN

 

EN

• Automatic receptacle controls (50% of number of receptacles)

CN

 

EN

• Service water heating (90% of capacity)

CN

 

EN

• Electric vehicle supply equipment OR PATH 2. BUILDING AUTOMATION SYSTEM (1 POINT) Develop a plan for shedding at least 10% of the project’s peak electricity demand for a minimum of one hour. The plan shall address both winter and summer peaks considering electrified grid projections. Use a control system that automatically sheds electricity demand in response to triggers denoting strain on the grid or high grid emissions. For example:

CN

 

EN

• Signal from a DR program provider

CN

 

EN

• Data obtained through an API indicating high grid emissions

CN

 

EN

• Peak demand tariff period when the grid is operating in the highest demand window

CN

 

EN

• Time-of-use rate when pricing is highest

CN

 

^ Enhanced Commissioning ← 工具箱 ← ID+C 首页 Enhanced Refrigerant Management v v