Energy and Atmosphere / 能源与大气

Enhanced Refrigerant Management

增强制冷剂管理
EAc6 Credit
EN

— ENHANCED REFRIGERANT MANAGEMENT EAc6 1–2 points

CN

增强制冷剂管理 EAc6 1–2 分

Intent / 意图

EN

To reduce greenhouse gas emissions (GHG) by accelerating the use of refrigerants with low global warming potential (GWP) and promoting better refrigerant management practices.

CN

通过加速使用低全球变暖潜值(GWP)制冷剂并改善制冷剂管理实践,减少温室气体排放。

Requirements / 要求

EN

Achievement Pathways Points Commercial Interiors 1–2

CN

达标路径:1–2 分

EN

Option 1. No Refrigerants or Low GWP 1–2

CN

选项 1. 不使用制冷剂或低 GWP(1–2 分)

EN

Path 1. No Refrigerants 2 OR

CN

路径 1. 不使用制冷剂(2 分) 项目不使用含制冷剂设备。

EN

Path 2. Low GWP Refrigerants 1–2

CN

或 路径 2. 低 GWP 制冷剂(1–2 分) 所有新安装含制冷剂设备的制冷剂总加权平均 GWP 不超过表 1 基准总加权平均 GWP 的 80%(1 分)或 50%(2 分)。通过减少单位容量制冷剂充注量来降低有效 GWP 的项目,可按附加导则调整基准。

EN

AND/OR

CN

和/或 选项 2. 限制制冷剂泄漏(1 分) 对项目使用的制冷剂设备进行设计、建造与运行,以最大限度减少泄漏。对于首次装修中制冷剂设备容量不足项目范围 50% 的项目,还须对基础建筑系统及项目范围内安装的系统进行合规记录。制冷剂设备须为自含式、无现场安装管路,且适用于:GWP > 700 的制冷剂;或 GWP ≤ 700 但至少泄漏一个完整制冷剂回路的设备。

EN

Option 2. Limit Refrigerant Leakage 1 Retail 1–2 Option 1 or 2 1

CN

和/或 选项 3. 食品零售 GreenChill 认证(1–2 分) 适用于商业零售项目;获得 EPA GreenChill 认证(企业级认证 1 分,店铺级认证再加 1 分)。

EN

AND/OR

CN

 

EN

Option 3. GreenChill Certification for Food Retailers 1–2 Commercial Interiors

CN

 

EN

Option 1. No Refrigerants or Low GWP (1– 2 points) PATH 1. NO REFRIGERANTS (2 POINTS) Do not use refrigerant-containing equipment in the project. OR PATH 2. LOW GWP REFRIGERANTS (1–2 POINTS) The maximum total weighted average refrigerant GWP in all new refrigerant-containing equipment is less than or equal to 80% (1 point) or 50% (2 points) of the total weighted average GWP of refrigerants meeting the benchmarks in

CN

 

EN

Table 1. Projects that limit effective refrigerant GWP by reducing refrigerant charge per unit of capacity relative to comparable equipment may use adjusted benchmarks per additional guidance.

CN

 

EN

Table 1. Refrigerant GWP benchmarks *GWP benchmarks are based on a 100-year time horizon GWP relative to CO 2.

CN

 

EN

AND/OR

CN

 

EN

Option 2. Limit Refrigerant Leakage (1 point) Design, construct, and operate the project’s refrigerant-using equipment to minimize refrigerant leakage. For initial build-out of projects with less than 50% of the capacity of refrigerant-using equipment installed in the project scope of work, compliance must be documented for base building systems as well as any systems installed in the project scope of work. Refrigerant-using equipment shall be self-contained, with no field-installed piping:

CN

 

EN

AND/OR

CN

 

EN

Option 3. GreenChill Certification for Food Retailers (1– 2 points) Available to projects where food retailing constitutes more than 20% of the project’s gross area. Demonstrate achievement of the Environmental Protection AgencyU.S. EPA’s GreenChill certification for projects in the U.S. For international projects, comply with the relevant GreenChill requirements for the certification level.

CN

 

EN

• For equipment with refrigerants > 700 GWP, AND

CN

 

EN

• For at least 80% of the total GWP of refrigerants used in the project Specify an “automatic leak detection” system in fully enclosed spaces with equipment that has an overall refrigerant charge exceeding 100 tons of equivalent CO 2 emissions (tCO2e). Installation Field-installed refrigerant piping shall use brazed or press-type fittings. Operation Have in place a refrigerant maintenance plan and designate a responsible oversight party. The plan shall include standards for recordkeeping and protocols for:

CN

 

EN

• Updating the refrigerant inventory.

CN

 

EN

• Tracking and recording refrigerant charge and leakage rates for all refrigerant-using equipment.

CN

 

EN

• Ensuring that installation, maintenance, and removal of refrigeration-containing equipment is performed by appropriately certified refrigeration personnel, including in tenant spaces.

CN

 

EN

• Auditing annually and calibrating automatic leak detection systems. GWP Benchmark* Equipment and Systems 1,400 Heat pump service hot water heaters 700 HVAC Data centers, computer room air conditioning, and information technology equipment cooling Process chiller equipment or ice rink refrigeration equipment 300 All other process refrigeration for retail, industrial, or cold storage

CN

 

EN

• For equipment without automatic leak detection systems, this means checking pressure loss and leaks at least as frequently and with the minimum intervals for equipment containing refrigerants as follows, with a total GWP as follows: o Every 24 months for 50 tCO2e or less o Every 12 months for 50 to 500 tCO2e o Every 3 months for more than 500 tCO2e

CN

 

EN

• Identifying the maximum time frame for repairing leaks.

CN

 

EN

• More frequent leakage testing and repairing must be , to be twice as frequent if the total annual refrigerant recharge/leakage exceeds 1%. Retail (1–2 points)

CN

 

EN

• Meet Option 1 and/or Option 2 above, or Option 3 below, for a maximum of 2 points.

CN

 

EN

• GreenChill Silver certification (1 point)

CN

 

EN

• GreenChill Gold or Platinum certification (2 points) For all options DISTRICT ENERGY Projects with district energy must comply with the requirements of this credit at the district facility or see additional guidance for interpretation of credit requirements.