8.11 Commissioning

8.11 调试

English(英文原文)中文(中文翻译)
Project goals around energy use are documented in the owner's project requirements (OPR). Green buildings ensure systems perform as intended through commissioning (Cx), the process of verifying and documenting that a project and all its systems are planned, designed, installed, tested, operated, and maintained according to project requirements. 有关能源使用的项目目标记录在业主项目要求(OPR)中。绿色建筑通过调试(Cx)确保系统按预期运行。
Cx improves energy performance and limits greenhouse gas emissions by verifying that systems are operating per the OPR. Project teams engage a commissioning provider (CxP) to complete these tasks. 调试通过验证系统按OPR运行来改善能源性能并限制温室气体排放。项目团队聘请调试提供者(CxP)完成这些任务。
Quality of life: Numerous studies have shown Cx has a very good return on investment. 生活质量:大量研究表明调试具有很好的投资回报率。