4.2 Integrative Process

4.2 整合过程

English(英文原文)中文(中文翻译)
A typical design process is linear and fragmented. One team member completes a task and passes the work off to the next person. Each team member completes their work in a silo, without collaboration. For example, a conventional new construction project begins with a client setting basic goals and handing them off to the design team, who hands the design off to the construction team, who then hands it over to the commissioning provider before ultimately transferring responsibility to facility operations. This approach disrupts information flows that are needed to complete certain analyses. It also fails to reinforce the mindset needed to develop truly sustainable and regenerative solutions. 典型的设计过程是线性和割裂的。一个团队成员完成任务后将工作传递给下一个人。每个成员在各自的信息孤岛中完成工作,缺乏协作。例如,一个传统的新建项目始于客户设定基本目标并移交给设计团队,设计团队将设计移交给施工团队,施工团队再移交给调试提供者,最终移交给设施运营。这种方法打断了完成某些分析所需的信息流,也无法强化开发真正可持续和再生性解决方案所需的思维模式。
Green building projects implement an integrative process instead of a typical design and construction process. An integrative process is an interdisciplinary collaboration method that helps project teams find interrelated solutions that enhance one another to meet everyone's needs. The process enables early and ongoing collaboration and strategy development to reduce costs, support health and well-being, and improve environmental performance. 绿色建筑项目采用整合过程而非典型的设计和施工过程。整合过程是一种跨学科协作方法,帮助项目团队找到相互关联、相互增强的解决方案,以满足各方需求。该过程支持早期和持续的协作及策略制定,以降低成本、支持健康与福祉,并改善环境绩效。
An integrative process for new construction comprises three phases: 新建项目的整合过程包括三个阶段:
Discovery: The team converges to plan, assess, and set goals. 发现阶段:团队汇聚在一起进行规划、评估和设定目标。
Design and Construction: Design is governed by iterative decision-making that continues throughout construction. 设计与施工阶段:设计由贯穿整个施工过程的迭代决策驱动。
Occupancy, Operations, and Performance Feedback: Performance measurements and feedback inform building operations and corrective actions when needed. 入住、运营与绩效反馈阶段:绩效测量和反馈指导建筑运营并在需要时采取纠正措施。
Commissioning providers can help weave the three phases together, weighing in on feasibility, inspecting construction quality, and testing and troubleshooting systems. 调试提供者可以帮助将三个阶段串联起来,参与可行性评估、检查施工质量,以及测试和排除系统故障。
An integrative process involves a wide array of project team members in the project, starting as early as possible, and builds alignment that streamlines later project phases. 整合过程涉及广泛的项目团队成员,尽早参与项目,建立一致性以简化后续项目阶段。
The earliest phase of an integrative process (discovery) is when there is the greatest opportunity to embed social and environmental goals. By treating even the earliest decisions as sustainability decisions, teams can find elegant, affordable solutions that are integral to the design — not seen as costly extras. 整合过程最早的阶段(发现阶段)是嵌入社会和环境目标的最大机会。通过将最早的决策也视为可持续性决策,团队可以找到优雅且经济的解决方案,这些方案是设计不可或缺的组成部分——而非昂贵的附加项。