CREDIT 积分项
Possible Points 可获分值:1–2 points 分
适用项目类型:New Construction 新建建筑 / Core and Shell 核心与外壳
影响领域(Impact Area Alignment):
✓ Quality of Life 生活质量 ✓ Ecological Conservation and Restoration 生态保护与修复 — Decarbonization 脱碳
To divert construction, demolition, and debris landfill waste by prior itizing reuse and recycling, and to encourage waste reduction at the source through design and construction practices.
通过优先考虑再利用和回收来转化施工、拆除和 debris 填埋废弃物,并通过设计和施工实践鼓励从源头减少废弃物。
Develop and implement a Construction and Demolition Waste Management Plan that documents the following:
制定并实施施工与拆除废弃物管理计划,记录以下内容:
Divert a minimum percentage of construction, demolition, and debris waste from landfill and incineration (without energy recovery).
将施工、拆除和 debris 废弃物的最低百分比从填埋和焚烧(无能量回收)中转化出去。
| Points 分值 | Required Diversion Rate 要求转化(此类别) | 中文说明 |
|---|---|---|
| 1 point 分 | 50% of total waste by weight | 按重量计算,总废弃物的 50% 转化 |
| 2 points 分 | 75% of total waste by weight | 按重量计算,总废弃物的 75% 转化 |
Source-Separated Minimum 源头分类最低要求:For BD+C projects, at least 50% of the diverted waste must be source-separated (not commingled). Commingled recycling is capped at 35% of total diverted waste, and only verified commingled rates count above 35%.
对于 BD+C 项目,至少有效转化废弃物的 50%必须是通过源头分类(非混合)完成的。混合回收的上限为有效转化废弃物的 35%,超过 35% 的部分仅计经核实的混合回收率。
Materials that are reused off-site (salvaged and sent to another project) are calculated at 200% of their weight toward the diversion rate.
被场外再利用(回收并送至其他项目)的材料,按其重量的 200%计入转化率。
LEED v5 prioritizes waste management strategies in the following order (highest to lowest credit):
LEED v5 按以下顺序优先考虑废弃物管理策略(分数从高到低):
| Priority 优先级 | Strategy 策略 | Multiplier / Credit 乘数/分值 |
|---|---|---|
| 1 (Highest) | Reuse (on-site or off-site) 再利用(现场或场外) | 200% weight credit for off-site reuse 场外再利用按 200% 重量计分 |
| 2 | Source-Separated Recycling 源头分类回收 | 100% weight credit (preferred method) 100% 重量计分(优先方法) |
| 3 (Lowest) | Commingled Recycling 混合回收 | Capped at 35% of diverted total; verified rates only above 35% 上限为转化总量的 35%;超过部分仅计核实率 |
| Waste Stream 废弃物流 | Weight (lbs/kg) 重量 | Credit Weight 计分重量 |
|---|---|---|
| On-site reuse (kept on project site) 现场再利用(保留在项目现场) | Actual weight 实际重量 | 100% credit(not extra multiplier) 100% 计分(无额外乘数) |
| Off-site reuse (salvaged and reused elsewhere) 场外再利用(回收并在其他地方再利用) | Actual weight 实际重量 | 200% credit(double weight) 200% 计分(双倍重量) |
| Source-separated recycling (verified) 源头分类回收(经核实) | Actual weight 实际重量 | 100% credit 100% 计分 |
| Commingled recycling (verified rate) 混合回收(核实率) | Weight × verified rate 重量×核实率 | Max 35% of diverted total 最高为转化总量的 35% |
| Landfill / Incineration (no energy recovery) 填埋/焚烧(无能量回收) | Actual weight 实际重量 | 0% credit(not diverted) 0% 计分(未转化) |
| Project Type 项目类型 | Special Provisions 特殊规定 |
|---|---|
| Schools 学校 | Playground equipment and modular classroom demolition waste may be included. 游乐场设备和模块化教室拆除废弃物可计入。 |
| Healthcare 医疗 | Regulated medical waste is excluded; only standard construction waste applies. 受管制的医疗废弃物不计入;仅标准施工废弃物适用。 |
| Data Centers 数据中心 | IT equipment recycling (e-waste) may be included with proper documentation. IT 设备回收(电子废弃物)在提供适当文档时可计入。 |
| Residential 住宅 | Appliance and fixture replacement waste may be included for multifamily projects. 多户住宅项目的家电和装置更换废弃物可计入。 |
| Documentation 文档 | Description 描述 |
|---|---|
| Waste Management Plan 废弃物管理计划 |
Signed plan with diversion goals, recycling strategies, and hauler list 签署的计划,含转化目标、回收策略和运输商清单 |
| Waste Diversion Report 废弃物转化报告 |
Verified weights, diversion rates, and calculation worksheet 经核实的重量、转化率和计算工作表 |
| Hauler Invoices / Weight Tickets 运输商发票/重量单 |
Original invoices or weight tickets from waste hauler and recycling facilities 来自废弃物运输商和回收设施的原发票或重量单 |
| Reuse Documentation 再利用文档 |
Photos and recipient acknowledgment for off-site reused materials 场外再利用材料的照片和接收方确认 |