— INTEGRATIVE DESIGN PROCESS IPc1 New Construction (1 point); Core and Shell (1 point)
Decarbonization · 脱碳 IPc1 New Construction (1 分); Core and Shell (1 分)
To support high-performance, cost-effective, cross-functional outcomes by analyzing interrelationships among systems early, and to give teams a holistic framework for addressing decarbonization, quality of life, and ecological conservation and restoration across the rating system.通过早期分析各系统间的相互关系,支撑高性能、高性价比、跨职能的成果,并为团队提供贯穿整个评级体系的整体框架,以同时应对脱碳、生活质量与生态保护修复。
From pre-design through early occupancy, identify and apply synergies across disciplines and systems via three initiatives: (1) Integrated team — assemble and convene an interdisciplinary team with diverse perspectives, facilitated equitably; (2) Design charette — conduct a charrette in pre-design/early design with the owner and at least four key perspectives (e.g., architect, contractor, energy modeler, community engagement); (3) LEED goal setting — define specific, measurable goals for decarbonization, quality of life, and ecological conservation/restoration, embedded in the owner's project requirements (OPR). Document the charette date, participants/roles, facilitator, and the OPR with measurable goals.从设计前期到早期使用阶段,通过三项举措识别并应用跨学科、跨系统的协同:(1)整合团队——组建并召集具多元视角的跨学科团队,以公平方式引导;(2)设计工作坊(charette)——在设计前期/早期与业主及至少四类关键视角(如建筑师、承包商、能耗模拟师、社区参与代表)开展工作坊;(3)LEED 目标设定——界定针对脱碳、生活质量、生态保护修复的具体可衡量目标,并纳入业主项目需求(OPR)。需记录工作坊日期、参与者及角色、引导者,以及包含可衡量目标的 OPR。
Front-load collaboration: bring owners, users, designers, engineers, contractors, and operators to the table before schematic design.Run a facilitated pre-design charrette with at least four distinct perspectives and produce a synergy map and meeting record.Set measurable goals mapped to LEED v5's three impact areas and embed them in the OPR and basis of design (BOD).Use an equitable facilitation approach (inclusive ground rules, rotating speaking, anonymous input) to capture all voices.Document outcomes (charette notes, participant list, OPR excerpts) to demonstrate the integrative loop from goal to verification. 前置协作:在方案设计前就让业主、使用者、设计师、工程师、承包商与运营方共同参与。在设计前期举办有引导的工作坊,至少涵盖四类不同视角,并产出协同关系图与会议纪要。设定与 LEED v5 三大影响领域对应的可衡量目标,并写入 OPR 与设计依据(BOD)。采用公平引导方式(包容规则、轮换发言、匿名输入)以收集所有声音。记录成果(工作坊纪要、参与者名单、OPR 摘录),以证明从目标到验证的整合闭环。