— OPERATIONAL CARBON PROJECTION AND DECARBONIZATION PLAN EAp1 New Construction and Core and Shell: Required (no points)
Decarbonization · 脱碳 EAp1 New Construction and Core and Shell: Required (no 分)
To let building stakeholders visualize how today's design decisions will affect long-term operational carbon emissions, and to ensure low-carbon outcomes are planned from a project's inception.使建筑利益相关方能够直观了解当前设计决策对长期运行碳排放的影响,并确保从项目伊始就规划低碳成果。
Four components must all be met: (1) Design Analysis—analyze efficiency, peak-load reduction, and decarbonization measures early using a simplified energy model, analysis of similar projects, or published data; (2) Site Energy Estimate—estimate annual site energy by source and submit to USGBC; (3) Review Carbon Projection—USGBC generates a 25-year business-as-usual (BAU) projection assuming grids decarbonize ~95% over that period; projects subject to a building performance standard (BPS) must create an ordinance-specific BAU and calculate expected fees; (4) Decarbonization Plan—Path 1 requires earning 4 or 5 points in EAc1 Electrification, or Path 2 requires a narrative of no more than two pages describing future retrofits, timeline, cost, discarded equipment, and electrification-readiness strategies.须同时满足四项:①设计分析——在设计早期采用简化能源模型、类似项目分析或公开数据,分析能效、峰值负荷削减与脱碳措施;②现场能源估算——按能源种类估算年度现场能耗并提交 USGBC;③审查碳预测——USGBC 生成 25 年「照常营业」(BAU)预测,假设电网在该期间脱碳约 95%,受建筑性能标准(BPS)约束的项目须制作符合法规的 BAU 并核算预期罚款;④脱碳计划——路径 1 须在 EAc1 电气化中获得 4 或 5 分,路径 2 须提交不超过两页的叙述,说明未来改造、时间表、成本、被淘汰设备及电气化就绪策略。
Electricity carbon falls toward zero by 2050 as grids decarbonize, but on-site combustion emissions stay constant—a key distinction for 2050 neutrality.The BAU projection visualizes 25 years of emissions assuming no operational change; buildings not substantially electrified must plan future retrofits.Smaller or less complex projects are not required to build a full energy model.Electrification-readiness (oversized panels, conduit, enhanced envelope, low-temp distribution) reduces future retrofit cost and disruption.Core and Shell analyzes anticipated tenant loads; Path 1 requires sufficient base-building systems to serve future tenants. 随着电网脱碳,电力碳排放在 2050 年前趋近于零,而现场燃烧排放保持不变——这是实现 2050 中和的关键区别。BAU 预测在「运营不变」假设下展示 25 年排放;未充分电气化的建筑须规划未来改造。较小或较简单的项目不强制要求建立完整能源模型。电气化就绪(加大配电盘、预留管线、强化围护、低温配送)可降低未来改造的成本与扰动。核心与外壳项目须分析预期租户负荷;路径 1 要求基础建筑系统足以服务未来租户。