Energy and Atmosphere / 能源与大气

Reduce Peak Thermal Loads

Decarbonization · 脱碳
EAc2 Credit
EN

— REDUCE PEAK THERMAL LOADS EAc2 New Construction: 1–5 points; Core and Shell: 1–5 points; Residential up to 5

CN

Decarbonization · 脱碳 EAc2 New Construction: 1–5 分; Core and Shell: 1–5 分; Residential up to 5

Intent / 意图

EN

To minimize demand on grid resources and improve the resilience of buildings.最大限度降低对电网资源的需求,并提升建筑的韧性。

CN

 

Requirements / 要求

EN

The envelope must meet ASHRAE 90.1 Section 5.5 or 5.6 (no envelope-vs-system trade-offs). Combine Options 1–4 (max 5 points): Option 1 Infiltration and Balanced Ventilation (1 pt; residential 2) — balanced supply/exhaust within 10% plus air-leakage testing below Table 1 caps; Option 2 Ventilation Energy Recovery (1 pt) — ERV/HRV with ≥70% enthalpy or ≥75% sensible recovery on each OA fan system; Option 3 Thermal Bridging (1 pt) — ASHRAE 90.1-2022 Section 5.5.5(a) without exceptions in climate zones 0–3; Option 4 Peak Thermal Load Reductions (1–3 pts) with preconditions (ventilation loads included, measured air leakage, balanced ventilation) and Path 1 Peak Load Intensity (sum peak heating+cooling per treated floor area: 16/12/8 Btu-h/sf = 1/2/3 pts), Path 2 ASHRAE trade-off methods (envelope 10%/20% = 1/2 pts; ventilation 10% via TSPR = 1 pt), or Path 3 Energy Simulation (PRM using peak loads in place of cost: PI 0.5/0.4/0.3 = 1/2/3 pts).围护须满足 ASHRAE 90.1 第 5.5 或 5.6 节(不允许围护与其他系统交易)。可组合方案 1–4(最高 5 分):方案 1 渗透与平衡通风(1 分;住宅 2 分)——送排风偏差在 10% 内且气密性测试低于表 1 上限;方案 2 通风能量回收(1 分)——各新风风机配备 ≥70% 焓回收或 ≥75% 显热回收的 ERV/HRV;方案 3 热桥(1 分)——ASHRAE 90.1-2022 第 5.5.5(a) 节且在 0–3 区无例外;方案 4 峰值热负荷削减(1–3 分)须满足前提(含通风负荷、实测气密性、平衡通风),路径 1 峰值负荷强度(单位处理楼面峰值供暖+制冷之和:16/12/8 Btu-h/平方英尺 = 1/2/3 分),路径 2 ASHRAE 交易法(围护 10%/20% = 1/2 分;通风经 TSPR 降 10% = 1 分),或路径 3 能源模拟(PRM 以峰值负荷替代成本:PI 0.5/0.4/0.3 = 1/2/3 分)。

CN

 

Key Points / 关键要点

EN

Reducing peak loads eases grid strain during summer/winter peaks when emissions and capacity stress are highest.Passive House designs (PHIUS/PHI) typically earn the full 3 points under Path 1.No envelope-vs-system trade-offs are allowed—a higher bar than EAp2.Option 1 and Option 4 require construction-phase verification of measured air leakage and balanced ventilation.Core and Shell: Options 1 and 3 drop the balanced-ventilation requirement; Option 2 needs ≥50% of ventilation air in base scope. 削减峰值负荷可缓解夏冬高峰期的电网压力,此时排放与容量压力最大。被动房设计(PHIUS/PHI)在路径 1 通常可获得满分 3 分。不允许围护与其他系统交易——门槛高于 EAp2。方案 1 与方案 4 须在施工阶段核验实测气密性与平衡通风。核心与外壳:方案 1、3 免除平衡通风要求;方案 2 须基础范围内含 ≥50% 通风空气。

CN

 