— TRANSPORTATION DEMAND MANAGEMENT LTc2 1–4 points
交通需求管理 LTc2 1–4 分
To reduce pollution and land development effects from automobile use through encouraging alternative transportation networks. To promote more livable and healthy communities through reduced vehicle miles traveled (VMT) and reduced associated emissions.
通过鼓励采用替代交通网络减少汽车使用带来的污染与土地开发影响。通过降低车辆行驶里程(VMT)及相关排放,促进更宜居、更健康的社区。
Achievement Pathways Points Commercial Interiors 1–4 Transportation Demand Assessment AND
达标路径:1–4 分
Option 1. Parking 1–3
须先完成交通需求评估(TDA),然后从下列选项中任选一项或多项,最高 4 分。
Path 1. Reduce Parking 1–3 AND/OR
交通需求评估 按以下步骤评估常规建筑使用者往返项目建筑的 VMT 与碳排放:
Path 2. Unbundle Parking 2
参与地方或区域政府强制的 TDM 项目,即满足上述交通需求评估要求。位于填充地块的可负担住宅项目,或位于交通优先区、或在现有/规划主要交通站点 0.5 英里(800 米)步行距离内的办公、混合用途、住宅或零售项目,可豁免上述要求。
AND/OR
并实施下列策略中的一项或多项,最高 4 分。
Option 2. Active Travel Facilities 1–3
选项 1. 停车(1–3 分)
Path 1. Base Building certified with LEED BD+C 1–2 OR
路径 1. 减少停车位(1–3 分) 项目所在建筑停车位数量较《交通工程师学会停车生成手册》第六版或合格交通工程师/规划师采用的同类资源所定基准比有所减少。按减少比例得分:30% 减 1 分;60% 减 2 分;100% 减(无车位)3 分。
Path 2. Active Travel Facilities in Base Building 1–2
和/或 路径 2. 停车位非捆绑租赁(2 分) 将停车位与租户空间租约分开购买;不提供免费停车位;按不低于当地公共或私人停车位市场价收取日费、月费或年费。
AND/OR
和/或 选项 2. 主动出行设施(1–3 分)
Option 3. Compliant Base Building 1
路径 1. 基础建筑获得 LEED BD+C 认证(1–2 分) 项目所在建筑获得 LEED v4/v4.1 BD+C 认证并在 LTc:自行车设施上得分;或获得 LEED v5 BD+C 认证并在 LTc2:交通需求管理上得分。
Path 1. Bicycle Network and Storage 1 AND/OR
或 路径 2. 基础建筑内主动出行设施(1–2 分) 满足「选项 3. 合规基础建筑」路径 1 的要求,得 1 分;满足路径 2 的要求,再得 1 分。
Path 2. Base Building Shower and Changing Facilities 1 AND/OR
和/或 选项 3. 合规基础建筑(1 分)
Path 3. Tenant Space Shower and Changing Facilities 1 AND/OR
路径 1. 自行车网络与停放设施(1 分) 自行车网络:项目所在建筑任一功能入口和/或自行车停放设施距满足以下标准的自行车网络 600 英尺(180 米)步行或骑行距离内:连续网络延伸至少 3 英里(4,800 米);由自行车道、自行车专用道、多用途步道或限速 25 mph(40 kph)的街道组成;规划自行车道须已获全额资金并于入住证明出具之日之前开工,且计划在入住后三年内完工。自行车停放设施:短期停放距任一主入口 600 英尺(180 米)步行距离内,每栋建筑不少于 4 个;长期停放距任一功能入口 300 英尺(90 米)步行距离内,每栋建筑额外不少于 4 个。共享微出行停放、公共自行车租赁站及公共自行车停车位最多可计入 50%,前提是满足最大步行距离、不重复计算,并将停放位置告知使用者和访客。
Path 4. Bicycle Maintenance 1 Transportation Demand Assessment Assess the number of VMT and carbon emissions associated with regular building occupants’ travel to and from the project building as outlined below:
和/或 路径 2. 基础建筑淋浴与更衣设施(1 分) 项目所在建筑提供至少占常规建筑使用者 1% 的淋浴及更衣设施;若离站设施可满足所有使用者需求且位于 0.25 英里(400 米)步行距离内,可接受。
Option 1. Parking (1 –3 points) PATH 1. REDUCE PARKING (1–3 POINTS) Locate in a building that provides a reduction in parking capacity using the base ratios for parking spaces found in the Institute of Transportation Engineers Parking Generation Manual, sixth edition, or a comparable resource applied by a qualified transportation engineer or planner or in supplementary LEED guidance. Points are awarded according to
和/或 路径 3. 租户空间淋浴与更衣设施(1 分) 在租户空间内为前 100 名常规建筑使用者各提供至少 1 处带更衣设施的淋浴,之后每 150 人增设 1 处;大型项目按标准递增。
Table 1.
和/或 路径 4. 自行车维护(1 分) 在长期自行车停放区内设置永久固定的自行车维修站,配备全套工具及牢固固定在维修架上的气泵。
Table 1. Points for Percentage of Reduced Parking Capacity Reduced Parking Percentage Points 30% reduction from base ratios 1 60% reduction from base ratios 2 100% reduction from base ratios (no parking) 3 AND/OR PATH 2. UNBUNDLE PARKING (2 POINTS) Unbundle parking by purchasing parking separately from the tenant space lease. Do not provide free parking for employees. Implement a daily, monthly, or annual parking fee at a cost equal to or greater than the local market rate for public or private parking.
AND/OR
Option 2. Active Travel Facilities (1– 3 points) PATH 1. BASE BUILDING CERTIFED WITH LEED BD+C (1–2 POINTS) Locate in a building certified with LEED BD+C under LEED v4 or LEED v4.1 that earned LTc: Bicycle Facilities, or in a building certified with LEED v5 BD+C that earned LTc2: Transportation Demand Management.
Table 2. Points for LEED BD+C-Certified Building Certification Credit Name Points Earned Equivalent LEED ID+C Points LEED v4 or LEED v4.1 LTc: Bicycle Facilities 1 2 LEED v5 LTc2: Transportation Demand Management 1 1 2 2 OR PATH 2. ACTIVE TRAVEL FACILITIES IN BASE BUILDING (1–2 POINTS) Locate in a building that meets the requirements for
Option 3. Compliant Base Building, Path 1, for 1 point. Meet
Option 3. Compliant Base Building, Path 2, for 1 additional point.
AND/OR
Option 3. Compliant Base Building (1 point) PATH 1. BICYCLE NETWORK AND STORAGE (1 POINT) Bicycle Network Locate the project in a building such that a functional entry and/or bicycle storage is within a 600-foot (180-meter) walking distance or cycling distance of a bicycle network that meets the following criteria:
Table 3. Number of Spaces Required for Short- and Long-Term Bicycle Storage Storage Type Commercial, Institutional, Healthcare Retail Short-term At least 2.5% of all peak visitors but no fewer than four spaces per building At least two short-term bicycle storage spaces for every 5,000 sq. ft. (465 sq. m.) but no fewer than two storage spaces per building Long-term At least 5% of all regular building occupants but no fewer than four storage spaces per building in addition to short-term storage At least 5% of regular building occupants but no fewer than two storage spaces per building in addition to the short-term bicycle storage spaces NOTE: Healthcare projects can exclude patients from the regular building occupant count for long-term storage. AND/OR PATH 2. BASE BUILDING SHOWER AND CHANGING FACILITIES (1 POINT) Locate the facilities in a building that provides access to on-site showers with changing facilities for 1% of all regular building occupants. Off-site showers and changing facilities are acceptable if they meet the needs of all occupants and are within a walking distance of 0.25 miles (400 meters). AND/OR PATH 3. TENANT SPACE SHOWER AND CHANGING FACILITIES (1 POINT) Provide at least one shower within the tenant space with a changing facility for the first 100 regular building occupants and one additional shower for every 150 regular building occupants thereafter. Large Occupancy Projects Provide at least one on-site shower within the tenant space with a changing facility for the first 100 regular project occupants and one additional shower for every 150 regular project occupants thereafter, up to 999 regular project occupants. Thereafter, provide the following:
• Estimate the annual VMT.
• Estimate annual baseline case for carbon emissions.
• Assess low-carbon transportation options.
• Estimate annual proposed case for carbon emissions.
• Estimate the total reduction of carbon emissions between annual baseline case and annual proposed case. Projects that participate in a local or regional government-mandated TDM program satisfy the transportation demand assessment (TDA)transportation demand assessment requirement. Residential affordable housing projects in an infill location or an office, mixed-use, residential, or retail project located within a transit priority area, or within 0.5 miles (800 meters) walking distance of an existing or planned major transit stop, are exempt from the above preceding requirements. AND Implement one or more of the following strategies for up to a total of 4 points.
• It is a contiguous network that spans a distance of at least 3 miles (4,800 meters).
• It consists of bicycle paths, lanes, multiuse trails, or streets with a maximum speed limit of 25 mph (40 kph). Sidewalks where local code permits bicycles are acceptable. Planned bicycle trails or lanes may be counted if they are fully funded by the date of the certificate of occupancy and are scheduled for completion within three years of that date. AND Bicycle Storage Provide short-term bicycle storage within a 600-foot (180-meter) walking distance of any main entrance, and with no fewer than four storage spaces per building. Provide long-term bicycle storage within a 300-foot (90-meter) walking distance of any functional entry, but with no fewer than four storage spaces per building in addition to the short-term bicycle storage spaces. Points are awarded according to Table 3 below. Shared micromobility storage, bicycle-sharing stations, and/or publicly available bicycle parking may be counted for up to 50% of the required short-term and long-term storage space if it meets the maximum allowable walking distance, and is not double-counted (i.e., the short-term and the long-term storage spaces are counted separately), and the storage location is communicated to the building occupants and visitors.
• One additional shower for every 500 regular project occupants, for an additional 1,000– 4,999 regular project occupants
• One additional shower for every 1,000 regular building occupants, for an additional 5,000+ regular project occupants AND/OR PATH 4. BICYCLE MAINTENANCE (1 POINT) Provide a permanently secured bicycle repair station that includes a complete set of tools and an air pump securely fastened to the repair stand in the area dedicated to long-term bicycle storage.