Integrative Process, Planning, and Assessments / 整合过程、规划与评估

Climate Resilience Assessment

气候韧性评估
IPp1 Prerequisite
EN

— CLIMATE RESILIENCE ASSESSMENT IPp1 Required

CN

气候韧性评估 IPp1 必须满足

Intent / 意图

EN

To promote comprehensive assessment of observed, projected, and future natural hazards for climate resilience, aiming to increase awareness of hazards, increase transparency of risks, reduce vulnerabilities, and ensure long-term safety and sustainability.

CN

促进对项目已观测、预测及未来自然灾害进行全面评估,以提升气候韧性;旨在增强灾害认知、提高风险透明度、降低脆弱性,并确保长期安全与可持续性。

Requirements / 要求

EN

Achievement Pathways Points Commercial Interiors N/A Climate and Natural Hazard Assessment Complete a climate and natural hazard assessment. As part of the assessment, identify observed, projected, and future natural hazards that could potentially affect the project site and building function. Address site-specific natural hazards, including, but not limited to, drought, extreme heat, extreme cold, flooding, hurricanes and high winds, hail, landslides, sea level rise and storm surge, tornadoes, tsunamis, wildfires and smoke, winter storms, and other relevant hazards. Identify two priority hazards, at minimum, to address through proposed design strategies. For each priority hazard, the project team must assess and specify the following:

CN

达标路径:N/A

EN

• Intergovernmental Panel on Climate Change (IPCC) emissions scenario used, specifying the shared socioeconomic pathways

CN

完成气候与自然灾害评估。作为评估内容,识别可能影响项目场地与建筑功能的已观测、预测及未来自然灾害。评估场地特有风险,包括但不限于干旱、极端高温、极端低温、洪涝、飓风与强风、冰雹、滑坡、海平面上升与风暴潮、龙卷风、海啸、野火与烟霾、冬季风暴及其他相关灾害。至少确定两项优先灾害,并通过拟采用的设计策略加以应对。对每项优先灾害,项目团队必须评估并明确以下内容:

EN

• Projected service life of the LEED project (e.g., fiscal year 2050 or 100 years)

CN

应尽可能利用评估信息指导项目的规划、设计、施工及运营维护,并说明项目特定策略如何与之呼应。

EN

• Hazard level

CN

 

EN

• Hazard risk rating

CN

 

EN

• Exposure, sensitivity, adaptive capacity, vulnerability, and overall risk levels

CN

 

EN

• Potential impact on the project site and building function

CN

 

EN

• Potential impact on the project site during construction Where possible, use the information from the assessment to inform the planning, design, and operations and maintenance of the project and describe how project-specific strategies were considered.

CN

 