— RENEWABLE ENERGY EAc3 1–5 points
可再生能源 EAc3 1–5 分
To encourage and recognize the use of renewable energy to reduce environmental and economic impacts associated with fossil fuel energy use, and increase the supply of new renewable energy within the electrical grid, and fostering a just transition to a green economy.
鼓励并认可使用可再生能源,以减少化石燃料能源使用的环境和经济影响,增加电网中新增可再生能源供应,并促进向绿色经济公正过渡。
Achievement Pathways Points Commercial Interiors 1–5 Renewable Energy Supply or Procurement 1–5 Supply or procure renewable energy meeting the renewable energy criteria referenced below. Points are rewarded according to
达标路径:1–5 分
Table 1. Points documented for Tier 1, Tier 2, and/or Tier 3 renewable energy may be added together up to a maximum of 5 points. Tenant annual site energy consumption must include the total estimated annual electricity and fuel use for systems and equipment within the project boundary or exclusively serving the project space (excludes excluding shared air handling units or thermal energy). AND The total estimated annual energy consumption for thermal energy (CHW or hot water) supplied directly to the tenant by a utility, energy provider, or plant that is not in the building. Renewable energy may be allocated to the tenant from the base building, provided it is allocated equally for the entire building area (including tenant area and base building core area). OR Incremental to the renewable energy required for the base building for LEED BD+C: Core and Shell EAc4: Renewable Energy.
按表 1 获得 Tier 1、Tier 2 和/或 Tier 3 可再生能源,各层得分可加总,最高 5 分。
Table 1. Points for Renewable Energy Procurement *A = the sum of gross floor area of all floors of the building up to the three largest floors of the building, prorated to the project based on project area. Renewable Energy Criteria RENEWABLE ENERGY CLASSIFICATIONS
租户年场地用能须包含项目边界内系统与设备或专属服务该空间系统的总估算年用电量和燃料用量(不包括共享空气处理机组或热能设备)。并包含由建筑外公用事业、能源供应商或能源站直接向租户提供的热能(冷冻水或热水)的总估算年用能。可再生能源可从基础建筑分配给租户,但须按整栋建筑面积(含租户面积与基础建筑核心面积)均等分配;或按 LEED BD+C: Core and Shell EAc4:可再生能源 所要求的、超出基础建筑可再生能源部分的增量部分计分。
Tier 1. On-site Renewable Energy Generation or Social Impact Project The renewable generation equipment may be located
表 1 按年可再生能源供应量占租户年场地用能的百分比(使用 100% 替代水源或低碳热源的系统按总估算年用能计)计分。Tier 1 为现场可再生能源发电或社会影响项目;Tier 2 为非现场可再生能源(由新发电资产在 2009 年后投产且五年内交付给项目的新可再生能源合同);Tier 3 为绿电/可再生能源证书(REC,须符合 Green-e Energy 或等效标准,且为证书有效期内交付给项目的新增量)。
Tier 2. New Off-site Renewable Electricity Off-site renewable electricity produced by new generation asset(s) must be
Tier 3. Off-site Renewable Energy
• On the project site;
• On the campus on which a project is located.; or
• On the site of an equity project, as long as the renewable power system is provided, installed, and commissioned at no cost to the equity entity; that the ownership of the renewable power system is transferred to the equity entity; and that the rights to the power provided be given to the equity entity.
• Contracted to be operational within two years of building occupancy, OR
• Contracted no more than five years after the renewable asset’s commercial operations date.
• Off-site renewable electricity that is Green-e® Energy certified or equivalent
• Renewable fuels that are Green-e Energy certified or equivalent Points Tier 1 Tier 2 Tier 3 Minimum Rated Capacity*1 OR Percent of Tenant Annual Site Energy Percent of Tenant Annual Site Energy Percent of Tenant Annual Site Energy 1 A × 1 W/sq. ft. (A × 10.8 W/sq. m.) OR 5% 20% 50% 2 A × 2 W/sq. ft. (A × 21.6 W/sq. m.) OR 10% 40% 100% 3 20% 60% 4 35% 80% 5 100% Tier 1 and/or Tier 2 renewable energy CONTRACT LENGTH
• Contract length shall be 10 years or prorated across 10 years for shorter contract lengths ENVIRONMENTAL ATTRIBUTES Ownership: All environmental attributes—Energy Attribute Certificates (EACs) or Renewable Energy Certificates (RECs)—associated with renewable energy generation must be retired on behalf of the LEED project for the renewable energy procurement to contribute to credit achievement. Project energy source: Renewable electricity generation and EAC procurement can only be applied to tenant electricity use or district energy use up to 100% of annual electricity, plus district energy use. Renewable fuels can only be applied to tenant fuel use or district heat up to 100% of annual fuel, plus district heat use. Vintage: EACs credited to the project must be generated no earlier than 18 months before the LEED project’s initial application submission date. Location: Tier 2 and Tier 3 renewable assets must be in the same country or region where the LEED project is located. Tier 2 bulk purchase: Green-e Energy certification or equivalent is required for one-time purchase or annual purchase of EACs or renewable power totaling more than 100% of the tenant’s annual electricity use.