— ELECTRIFICATION EAc1 1–5 points
电气化 EAc1 1–5 分
To encourage buildings to be designed so that they does not depend on burning fuel on-site, which leadsing to better indoor and outdoor air quality and to low-carbon operations as the grid decarbonizes.
鼓励建筑设计不依赖现场燃烧化石燃料,以改善室内外空气质量,并在电网脱碳的同时实现低碳运营。
Achievement Pathways Points Commercial Interiors 1–5
达标路径:1–5 分
Option 1. No On-Site Combustion— Base Building and Tenant Systems 5
选项 1. 基础建筑与租户系统均无现场燃烧(5 分) 项目自启用起无现场燃烧设备,应急备用系统除外。空间供暖与生活热水(SWH)设备的综合加权平均效率:首次装修须不低于 1.8 COP,改造项目须不低于 1.2 COP。以下设备可排除:气候区 0–2 的空间供暖设备;仅用于低温运行的辅助加热设备;非居住空间按 ASHRAE 90.1-2022 第 11.5.2.3.3 节点式热水器标准且无例外条款的 SWH 设备。
OR
或 选项 2. 低温运行时外无现场燃烧——基础建筑与租户系统(1–5 分) 下列路径任意组合,最高 5 分。
Option 2. No On-Site Combustion Except at Low Temperatures— Base Building and Tenant Systems 1–5
路径 1. 空间供暖(2 分) 空间供暖设计须能在低温运行外不依赖现场燃烧;气候区 3 及以上项目的加权平均空间供暖效率须不低于 1.8 COP(首次装修)或 1.2 COP(改造)。仅低温运行的辅助加热设备可排除。
Path 1. Space Heating 2 AND/OR
和/或 路径 2. 生活热水(1 分) SWH 系统设计须能在低温运行外不依赖现场燃烧;总 SWH 容量超过 34,000 Btu/hr(10 kW)的项目,加权平均生活热水设备效率须不低于 1.8 COP(首次装修)或 1.2 COP(改造)。节点式热水器及仅低温运行的辅助加热设备可排除。
Path 2. Service Water Heating 1 AND/OR
和/或 路径 3. 烹饪及其他工艺负荷(1–2 分) 烹饪、洗衣、工艺设备及现场发电(应急备用除外)设计须不依赖现场燃烧。不在范围内(1 分):烹饪、洗衣或工艺加热系统不在项目范围内;在范围内(2 分):项目范围内安装有烹饪、洗衣、工艺加热、工艺干燥和/或现场发电。低温运行工艺加热设备可排除。
Path 3. Cooking and Other Process Loads 1–2
或 选项 3. 有限范围内无现场燃烧(1–3 分) 项目范围内不得安装现场燃烧设备;新安装空间供暖与 SWH 综合加权平均效率须不低于 1.8 COP(首次装修)或 1.2 COP(改造),气候区 0–2 空间供暖、仅低温辅助加热及节点式热水器可排除。按表 1 根据项目范围最低工作量得分。
OR
或 选项 4. 基础建筑文件与租户合规(5 分) 项目所在建筑已记录达到表 2 中某项 LEED 得分点,且/或项目范围内各系统类型(空间供暖/SWH/烹饪与其他工艺负荷)均满足:不安装现场燃烧设备,且空间供暖与 SWH 综合加权平均效率不低于 1.8 COP(首次装修)或 1.2 COP(改造),气候区 0–2 空间供暖、仅低温辅助加热及节点式热水器可排除。按表 2 得分。
Option 3. No On-Site Combustion, Limited Scope 1–3
所有选项的设备效率可用额定工况计算,或采用能耗模拟计算年平均 COP。区域能源项目须在区域设施层面满足要求。使用化石燃料的燃料电池不符合得分条件。
OR
Option 4. Base Building Documentation and Tenant Compliance 5
Option 1. No On-Site Combustion — Base Building and Tenant Systems (5 points) Design and operate the project from start-up with no on-site combustion except for emergency support systems. The combined weighted average equipment efficiency for space heating and service water heating (SWH) must be at least 1.8 Coefficient of Performance (COP) for initial build-out construction or at least 1.2 COP for alterations. The following equipment may be excluded from the COP determination:
OR
Option 2. No On-Site Combustion Except at Low Temperatures— Base Building and Tenant Systems (1– 5 points) Pursue any combination of the following paths for a maximum of 4 5 points: PATH 1. SPACE HEATING (2 POINTS) Design space heating to be capable of operating without on-site combustion except at low temperatures. Projects in climate zones 3 and above must have a weighted average space heating equipment efficiency of at least 1.8 COP for initial build-out construction or at least 1.2 COP for alterations. The following equipment may be excluded from the COP determination:
OR
Option 3. No On-Site Combustion, Limited Scope (1– 3 points) For the project scope of work:
Table 1. Points For No On-Site Combustion, Limited Scope Minimum Project Scope of Work Points One or more cooking, heating, SWH, or process heating systems 1 At least 20% of the project’s peak combined heating and SWH load, or all commercial cooking equipment 2 At least 50% of the project’s peak combined heating and SWH load, or all commercial cooking equipment 3
OR
Option 4. Base Building Documentation and Tenant Compliance (5 points) Points are awarded according to
Table 2. Locate in a building that has documented a LEED credit per
Table 2. AND/OR Meet the following criteria per system type in the project scope of work. The system types are defined as:
Table 2. Points for Achievement of Base Building Performance and Tenant Performance Base Building Documentation Minimum System Types in Project Scope Complying with Criteria Points Awarded LEED Rating System(s) LEED EA Credit Name and Credit Option Base Building Minimum Threshold LEED v5 BD+C EAc1: Electrification 1 point None 1 2 points None 2 3 points At least one, or all systems in scope 3 4 points At least two, or all systems in scope 4 5 points (NC) 4 points (CS) All systems in scope 5 LEED v5 O+M: Existing Buildings EAc1: GHG Emissions Reduction Performance,
Option 1. GHG From On-Site Combustion 2 points None 1 3 points None 2 4 points At least one, or all systems in scope 3 5 points At least two, or all systems in scope 4 6 5 points All systems in scope 5 For all options Equipment efficiency (for Options 1 and 2) Determine weighted average COP using either of the following:
• Space-heating equipment in climate zones 0–2
• Supplemental heating equipment designed only for operation at low temperatures
• SWH equipment in nonresidential spaces complying with the point-of-use water heater criteria in ASHRAE 90.1-2022, Section 11.5.2.3.3, W05, without exceptions
• Supplemental heating equipment designed only for operation at low temperatures AND/OR PATH 2. SWH (1 POINT) Design SWH systems to be capable of operating without on-site combustion except at low temperatures. Projects with total SWH capacity exceeding 34,000 Btu/hr (10 kW) must have a weighted average service hot water equipment efficiency of at least 1.8 COP for initial build-out construction or at least 1.2 COP for alterations. The following equipment may be excluded from the COP determination:
• SWH equipment in nonresidential spaces complying with the point-of-use water heater criteria in ASHRAE 90.1-2022, Section 11.5.2.3.3, W05, without exceptions
• Supplemental heating equipment designed only for operation at low temperatures AND/OR PATH 3. COOKING AND OTHER PROCESS LOADS (1–2 POINTS) Design cooking, laundry, process equipment, and on-site power generation except emergency support systems to be capable of operating without on-site combustion. Not in scope (1 point)
• Cooking, laundry, or process heating systems are not in project scope of work. In scope (2 points)
• Cooking, laundry, process heating, process drying, and/or on-site power generation are installed within the project scope. The following equipment may be excluded:
• Process heating equipment designed for operation at low temperatures
• Do not install on-site combustion equipment in the project scope of work.
• Combined weighted average equipment efficiency for new space heating and SWH must be at least 1.8 COP for initial build-out construction or at least 1.2 COP for alterations. The following equipment may be excluded from the COP determination:
• Space heating equipment in climate zones 0–2
• Supplemental heating equipment designed only for operation at low temperatures
• SWH equipment in nonresidential spaces complying with the point-of-use water heater criteria in ASHRAE 90.1-2022, Section 11.5.2.3.3, W05, without exceptions Points are awarded according to Table 1 based on the minimum project scope of work.
• Space heating
• SWH
• Cooking and other process loads Criteria per system type:
• Do not install on-site combustion equipment. AND
• Combined weighted average equipment efficiency for space heating system type and SWH system type must be at least 1.8 COP for initial build-out construction or at least 1.2 COP for alterations. The following equipment may be excluded from the COP determination:
• Space heating equipment in climate zones 0–2
• Supplemental heating equipment designed only for operation at low temperatures
• SWH equipment in nonresidential spaces complying with the point-of-use water heater criteria in ASHRAE 90.1-2022, Section 11.5.2.3.3, W05, without exceptions
• Equipment efficiencies at rated conditions. For equipment with multiple rated conditions, use the rating closest to 17°F (−9°C) outside air dry-bulb temperatures (OA db)OA db, 32°F (0°C) entering liquid temperature, or 44°F (6°C) heating source leaving liquid temperature.
• Annual average COP calculated with an energy simulation. District energy Projects with district energy must comply with the requirements of this credit at the district facility or see additional guidance for interpretation of credit requirements. Fuel cells Fuel cells using fossil fuel are ineligible for credit. Low temperatures The term “Low temperatures” refers to outside air dry-bulb temperatures (OA db) below 20°F (−6.5°C).