8.18 Emergency Contingencies

8.18 应急措施

English(英文原文)中文(中文翻译)
Electrifying buildings increases reliance on the power grid. Power outages do happen, often during emergencies. Green buildings have contingency plans based on an assessment of hazards, vulnerabilities, and risks. 建筑电气化增加了对电网的依赖。停电确实会发生。绿色建筑设有基于危害、脆弱性和风险评估的应急计划。
Having a renewable source of backup power instead of fossil-fuel generators can be critical. Projects can isolate their systems through intentional islanding — separating from the main power network to continue functioning safely and independently. 拥有可再生备用电源而非化石燃料发电机可能至关重要。项目可以通过有意的孤岛运行隔离其系统,从主电网中分离以安全独立地继续运行。