— FUNDAMENTAL COMMISSIONING EAp3 Required
基础调试 EAp3 必须满足
To improve energy performance and limit GHG emissions by verifying that systems are operating per the OPR.
通过基本调试提高项目预期性能,确认项目系统按设计意图运行。
Achievement Pathways Points Commercial Interiors N/A Comply With Commissioning Requirements Comply with ANSI/ASHRAE/IES Standard 90.1 commissioning requirements for building systems, controls, and the building envelope, as applicable to the project scope, with the following additional provisions:
达标路径:N/A
• All projects shall provide commissioning that addresses the project scope of work, including any tenant interfaces or interconnections with base building systems. Section 4.2.5.2 exceptions shall not apply.
须符合 ANSI/ASHRAE/IES Standard 90.1 对建筑系统、控制及建筑外围护结构的调试要求(按项目范围适用),并附加以下规定:
• The referenced version of Standard 90.1 with errata shall be: o 2019 or later for projects registered before January 1, 2028. o 2022 or later for projects registered on or after January 1, 2028.
• By the end of the design development phase, the owner shall designate a commissioning provider (CxP) with experience completing commissioning on at least two projects of equal or larger scope and complexity. For alterations meeting the criteria in Exception 4.2.5.2, the CxP may be directly associated with design or installation of the building systems or controls being commissioned.
• In addition to the requirements of the applicable version of ASHRAE 90.1, the CxP shall: o In pre-design, or as early as possible, assist in the development of the OPR, reviewing and updating the OPR through design and construction. OPR must address project scope of work for HVAC, SWH, power, lighting, other equipment including on-site renewable energy, and envelope. o During design, review the BOD for compliance with the OPR, and attend at least one meeting to discuss review comments and commissioning. o During construction, review submittals and substitutions for design deviations that impact the OPR, attend at least one milestone meeting, and perform a sample review (minimum 10%) of completed contractor documentation for QA/QC.